Maximo Basics- How to Creating an Asset core step by step
So let's pretend that we have a vehicle here. And we need to manage it in Maximo. As long as the owner has an engine, like the wheels, and a list of spare parts that we can use to provide maintenance work, provide inventory for our maintenance books, and also we have some small maintenance plans for the equipment. So first of all, we will create our asset record for our vehicle. So let's go back to Maximo. I'm going to click here on this button to create a new record. I'm going to call it this guy, Chuck. Okay. And going to choose the type of production which a production accepts. Yeah, I think that's it, and then I'm going to save it. (This tutorial Maximo Basics- How to Creating an Asset core step by step)
Now I'm going to create another record for our components, the first component is an EN link for the check. So I'm going to create a new one. And yeah, so in this case, I'm gonna specify the parent accept of this ending is the asset number of our chart that we just defined. And now I'm going to create four more asset to asset to report four wheels. So in this case, we got a similar asset, so I'm going to duplicate it by clicking on the duplicate asset here. And I'm going to enter a new asset number, same parent as well. And we're going to do the same thing. Okay. So now if we open our original upset see Chuck, we can click on this button and choose move to upset here. (This tutorial Maximo Basics- How to Creating an Asset core step by step)
And if we click on the spot, up there, we can see the sub assembly which is the component of this asset is the asset. So we know that with this asset, we have these components. And if we click on the Open drill down, we can see the hierarchical structure of this asset as well. And now Let's continue by gripping the thesis paper and associate those with our asset.
0 Comments